CONSTRUCTION PROGRESS PHOTO CHECKLIST — Ditch Guide: https://ditch.pro/blog/progress-photo-documentation Project / ID: Visit date and time: Photographer: Area / level / room: BEFORE THE WALK [ ] Confirm jobsite, planned areas, and authorized access. [ ] Review prior photos and open questions. [ ] Check battery, storage, lens, time setting, and location availability. [ ] Plan coverage before relevant work is concealed. CAPTURE [ ] Area overview. [ ] Changed work. [ ] Relevant detail connected to an overview. [ ] Work about to be covered, where applicable. [ ] Open questions with factual notes and next steps. BEFORE LEAVING [ ] Check image clarity. [ ] Confirm correct project and useful location notes. [ ] Verify upload or backup; note queued files. [ ] Record inaccessible or unphotographed areas. [ ] Select photos appropriate for the recipient. GAPS / FOLLOW-UP Observation: Owner: Next action: Due date: Adapt to your project. Not a replacement for required inspections or approvals. Ditch — September 25, 2026